Test Plan

Document Change Control

Release No Release DateIssued ByVersion CommentClickUp Version Time
1.001/25/2025Bahaa TawfikFull Release Test Plan (Sprints 1–7)

 

List Of Approvers

Name TitleApproved Release No
Tarek Ramadan Software Engineering Director

 


  

Project Overview

Project Manager /Scrum Master

 

 

Marwa Osama/ Ahmed Essam

 

 

System Under Test (SUT) – Project Name

 

 

RCRC - استدامة الرياض (Sustainability Riyadh)

 

 

Software Under Test Version

 

 


 

 

1.       Introduction

1.1.        Purpose

The purpose of this test plan is to define the testing strategy, resources, and schedule for Sprints 1-7 of the استدامة الرياض project. It aims to ensure that the core foundations of the sustainability system—Entities, KPI Streams, and Project/KPI linkages, KPO/Project progress submission—are functionally sound and traceable.

1.2.        Scope

This plan covers the testing activities for the specific features delivered in the Sprints 1-7 build, Activities Covered: Functional Testing, E2E Regression Testing (Manual)/Integration Testing, UI Testing, Localization Testing, and Defect Management, Test Summary Reporting and traceability verification for the following features:

  • Entity registration and classification.
  • KPI Stream configuration.
  • Sustainability Project/Procedure registration including milestones and activities.
  • KPI Card modifications and project-to-KPI linking.
  • KPO/Project progress submission
  • Security & access rights for every role

Target: Maximum coverage of all enhancements across the Employee Screen, Organizational Structure, and Job Classification modules , Mandate &over time modules via below sprints

 

RCRC > RCRC_Sprints > Sprint 1 (1/11 - 1/24)26RCRC > RCRC_Sprints > Sprint 2 (1/25 - 2/7)61RCRC > RCRC_Sprints > Sprint 3 (2/8 - 2/21)32RCRC > RCRC_Sprints > Sprint 4 (2/22 - 3/7)53RCRC > RCRC_Sprints > Sprint 5 (3/8 - 3/21)27RCRC > RCRC_Sprints > Sprint stab 6 (3/30 - 4/5)8RCRC > RCRC_Sprints > Sprint 7 (4/5 - 4/18)10

 

2.       Test Basis

 

#

 

 

Source Work Product

 

 

Information Extracted

 

 


 

 

USs in Sprint 1RCRC > RCRC_Sprints > Sprint 1 (1/11 - 1/24)26

 

 

US: Register Entities, Mandatory fields (Entity Type), uniqueness constraints, and default Active status.US: Configure Streams, Stream attributes (Name/Description), uniqueness, 70-char limit, and deactivation logic.US: Register Projects, Hierarchical structure (Project > Milestone > Activity) and 100% weight calculation rules.US: KPI Card Mods, Ownership substitution fields (Entity, Director, Rep), polarity, and reminder days (1-7).

 

 

 

 

Design references (Screenshots of Product /Wireframes)

 

 

as US project plan feature

 

 

 

 

 

 

 

 

3.       Approach

The testing strategy follows a structured, Agile-based methodology integrated into the development lifecycle. Testing is divided into sequential phases to ensure comprehensive quality checks, prioritizing a robust manual execution strategy for foundational stability. This is balanced with a Risk-Based Testing approach, which directs intensive effort toward critical system areas, specifically financial/weight logic and automated notification triggers, to ensure high-stakes functionalities are verified with the highest priority.

3.1.        Features to be tested\not to be tested

  • To be tested: All Sprint 1 User Stories (Entities, Streams, Projects, KPI Cards, and Linking).
  • Not to be tested: Data migration from legacy systems, mobile app performance, and third-party API integrations (out of scope for Sprints 1-7).

 

3.2.        Test Design Techniques & Prioritization

A.   Test Design Techniques

  • Boundary Value Analysis (BVA): Applied to the Reminder Days (Range 1-7) and the Name fields (300 characters for projects, 70 characters for streams).
  • Equivalence Partitioning: Used to categorize valid and invalid inputs for Entity Types (RCRC vs. External) and KPI Types (Direct vs. Indirect).
  • Security Testing Strategy for Access Rights
    • A. Positive Validation (Authorized Access)
    • B. Negative Validation (Unauthorized Access/Penetration)
  • Error Guessing / Negative Testing: Attempting to save a Milestone or Activity without providing a description to check for mandatory field enforcement.
    • Entering non-numeric characters in Weight (الوزن), CAPEX, or OPEX fields.
    • Attempting to deactivate a Stream (مسار) that is currently linked to an active KPI to verify the system warning and block.
    • Entering a Start Date that is later than the End Date to trigger logical validation errors.

 

B. Risk-Based Testing & Test Case Prioritization

Test cases are prioritized using a P1–P3 scale based on their impact on sustainability tracking and financial accuracy:

 

Priority

 

 

Focus Area

 

 

Example Scenario

 

 

P1: Critical

 

 

Weight Logic & Linking

 

 

Verifying that the total weight of all Milestones equals exactly 100% and that KPIs reflect in the Project Page.

 

 

P2: High

 

 

Mandatory Constraints

 

 

Ensuring Entity Director and Representative are auto-populated correctly and remain Read-only.

 

 

P3: Medium

 

 

Optional Attributes

 

 

Testing Supporting Stakeholders (الجهات الداعمة) and Audit Trail readability for minor field changes.

 

 

 

 

 

3.3.        Review Plan

 

No.

 

 

Work Product

 

 

Method

 

 

Reviewer

 

 

Date

 

 

Comments

 

 

1

 

 

Test Plan v1.0

 

 

Peer Review / Walkthrough

 

 

QC Lead,  

 

 

15-01-2026

 

 

Ensure all US AC are covered.

 

 

2

 

 

User-story Test Cases – Sprints 1-7

 

 

Inspection, formal acknowledgement

 

 

QC leadDev.,

 

 

during sprint range

 

 

Ensure TCs meet all ACs and reflect expected behavior.

 

 

3

 

 

Sprints 1-7 - Test Summary Report

 

 

Walkthrough; formal acknowledgement

 

 

PO, Dev Lead, Tarek Ramadan

 

 

Day 1 Post-Sprint

 

 

Executive review and quality status sign-off.

 

 

 

3.4.        Suspension and Resumption criteria

  • Suspension: If any "Showstopper" (Severity 1) defect blocks more than 40% of testing progress.
  • Resumption: Once the blocking defect is fixed and verified in the test environment.

 

3.5. Constraints

  • Compressed Testing Window: Due to aggressive delivery timelines, the time allocated for system and integration testing was severely restricted.
  • Reduced Test Documentation: By mutual agreement with stakeholders to avoid timeline slippage, Test Cases were not authored for some User Stories. Testing for lower-priority stories was conducted via exploratory sessions rather than formal scripted testing.
  • Dependency Management: The project required a complete mid-cycle re-adjustment of US dependencies, sequences, and priorities. This shift forced the QA team to abandon existing test schedules and realign testing efforts with the new critical path.

4.       Resource and Training

<Details of available resources included within the plan, their function, and any identified training requirement(s) required for the plan.>

 

Resource Name

 

 

Role/Responsibility

 

 

Training Requirements

 

 

QC Team

 

 

Manual/Functional Testing

 

 

RCRC Sustainability Domain knowledge. and product

 

 

 

 


 

 


 

 

 

5.       Test Pass/Fail Criteria

  • Pass: 100% of Critical and High priority Test Cases passed. 0 Critical/High defects open.
  • Fail: Any Critical defect remaining open or more than 5% of test cases failed.

 

6.       Environment

  • Software: Separated Test Environment dedicated for testing only match production criteria, Web Application (Chrome/Edge latest), SQL Server, ClickUp for Bug Tracking.
  • Hardware: Standard QC Workstations.

 

7.        Deliverables

 

Milestone

 

 

Deliverable

 

 

Description

 

 

Owner

 

 

Due Date

 

 

Sprint Planning

 

 

Approved Test Plan v1.0

 

 

Formalized strategy and scope.

 

 

QC Lead

 

 

the beginning of sprint

 

 

Sprint Execution

 

 

Executed TCs & Evidence

 

 

Documented pass/fail status for all Functional and Regression TCs.

 

 

QC member

 

 

End of Sprint

 

 

Sprint Execution

 

 

Defect Log (ClickUp)

 

 

Formal tracking and status of all reported and fixed defects.

 

 

QC member

 

 

Daily

 

 

Release Stabilization

 

 

Sprint Test Summary Report

 

 

Summary of testing outcomes, coverage, and final quality status.

 

 

QC member

 

 

Day 1 Post-Sprint

 

 

8.        Non-Functional Testing

 

Test Type

 

 

Focus Activity

 

 

Localization

 

 

Verification of all Arabic labels and validation messages. Testing character set acceptance for English/Arabic name fields.

 

 

Usability

 

 

Ensuring the Entities module is intuitive and the " الجهات" renaming is clear.

 

 

Traceability

 

 

Validating that every field update correctly logs "Who, What, and When".

 

 

Reliability

 

 

The goal here is to ensure that the project's "100% weight" constraint is enforced consistently. If this logic fails, the entire project management becomes unreliable, leading to wrong KPIs and reporting.